ropeways.net | Home | Ropeways | 2020-11-16

Mt. Sunapee Master Plan Includes Lift System Overhaul

Vail Resorts recently submitted an updated improvement plan for Mt. Sunapee to the State of New Hampshire which includes construction of five new chairlifts and two surface lifts. Most transformative would be the West Bowl expansion, including a mile long high speed quad and 1,082 feet of vertical. This would be Mt. Sunapeeís longest lift, servicing five new trails. West Bowl would also feature a new beginner conveyor, parking and guest services building.

Vail also plans to upgrade the Sunapee Express to a six pack or combination lift with gondola cabins capable of moving 3,000 guests per hour. The existing high speed quad opened in 1998 and is undersized for the amount of terrain it services.

As planned by Triple Peaks before the 2018 Vail purchase, the North Peak triple would be replaced by a fixed grip quad. The nearby Spruce triple is also slated to be upgraded to a fixed quad, compensating for Vailís recent removal of the Duckling double. Itís possible one of these two lifts would utilize equipment from the former Sunbowl quad, which remains in storage on site.

A new triple chair would be be built to connect the bottom of Sunbowl to North Peak. Known as Cataract, this lift would service a modest amount of new terrain and improve skier circulation. Rather than purchasing new, Vail may opt to re-use equipment from the North Peak and/or Spruce triples for Cataract.

A rope tow is proposed to link Parking Lot 2 and Spruce Lodge, reducing the resortís reliance on shuttle buses. Finally, Vail seeks to add a grip maintenance building and carrier storage for the Sunbowl Express.

The plan would increase Mt. Sunapeeís comfortable carrying capacity by 40 percent to 6,850 skiers. Most of the proposed projects were previously approved during Triple Peaks ownership, though a few are new. A public meeting will be held Thursday evening to solicit comments or you can submit them to MountSunapeeComments@dncr.nh.gov. The deadline to weigh in is November 12th.

Article by Peter Landsman

http://www.liftblog.com



Back
Add Photos
Print


Google Adsense