ropeways.net | Home | Ropeways | 2021-10-05

Storm Damages Gallix Chairlift in Quebec

Heavy rains caused the drive terminal of a Northern Quebec ski resort’s only chairlift to collapse Sunday night. Photos from the scene show all four terminal legs and the operator house out of position with the motor room hanging precariously. The lift involved is a 1998 Doppelmayr fixed grip quad with a slope length of 2,660 feet.

“The Gallix station team is working hard to secure the perimeter of the lift pending the arrival of the supplier inspectors,” the mountain said in a statement. “During this time, we ask the public not to visit the scene because of the extreme danger of soil stability and chairlift structure. It’s still too early to conclude anything about the 2021-22 season. Thank you for your words of encouragement and understanding,” the mountain added.

The chairlift cost CA$1.5 million when it was installed. A meeting is scheduled for Wednesday between the ski area and its insurance company.

Article by Peter Landsman

http://www.liftblog.com





Back
Add Photos
Print


Google Adsense