ropeways.net | Home | Ropeways | 2024-08-28

Snowbasin Announces Becker Replacement

Snowbasin Resort will construct its seventh detachable lift next summer, replacing the Becker triple in a new alignment. The detachable quad, to be constructed by Leitner-Poma of America, will load closer to the Wildcat Express and unload in a simlar location to the current triple. Becker is a 1986 Stadeli triple, one of just 21 Stadeli-built lifts remaining in the United States. When the replacement is complete in 2025, Snowbasin will operate just one fixed grip chairlift, another Stadeli triple called Porcupine. Snowbasin has been on a roll lately, adding the Wildcat Express in 2017, Middle Bowl Express in 2021 and DeMoisy Express in 2023. Snowbasin’s owner, the Holding family, has been on a similar improvement push at its Sun Valley Resort in Idaho. Between the two mountains, the Holdings have purchased eight detachable chairlifts in nine years.

The new Becker will span more than 5,800 linear feet with a vertical ascent of approximately 1,300 feet, serving a variety of terrain and providing access to the Strawberry area. The new lift will transport 1,800 skiers per hour and cut ride time in half from 12 minutes to six. In conjunction with the lift installation, Snowbasin will widen and re-grade Bear Hollow, Snowshoe and Slow Road to improve flow and safety.

Snowbasin also announced a refurbishment of the Needles Gondola‘s 86 cabins, which are nearing 26 years old. The first third of cabins will receive new mechanisms, windows and seats this summer with the rest to follow over the next two years.

Article by Peter Landsman

http://www.liftblog.com






Back
Add Photos
Print


Google Adsense