ropeways.net | Projects | Current | 2023-06-02

Mt. Southington to Install New Triple Chair

Construction has already begun on the only lift project in the state of Connecticut this year at Mt. Southington. The new Northstar triple, built by Partek Ski Lifts, will replace a Hall double of the same name and improve access to beginner terrain. Partek, based in Pine Island, New York, supplies economical fixed grip chairlifts exclusively to small and mid sized mountains. Mt. Southington already operates two Partek lifts called Avalanche and Thunderbolt. Partek is also building a new chairlift for Trollhaugen, Wisconsin this year.

Mt. Southington’s outgoing Hall double has been sold to another New England ski area and may be re-installed for the 2024-25 ski season. That mountain would be the lift’s third home following stints at Craigmeur, New Jersey from 1976 to 1997 and Mt. Southington from 2001 to 2023.

Article by Peter Landsman

http://www.liftblog.com



Back
Add Photos
Print


Google Adsense